ADU Rules

Minneapolis ADU Rules (2026)

Everything homeowners need to know about building an accessory dwelling unit in Minneapolis - size limits, setbacks, permits, and the recent changes that made it easier than ever.

Last verified: August 2026 9/10 · Very ADU-friendly
1,000 sq ft*
Max detached size (or 50% of house, if smaller)
20 ft
Detached ADU height limit
3 ft
Side & rear setback (5 ft from alley)
Not required
Owner-occupancy, citywide
This page summarizes Minneapolis Zoning Code Chapter 537 (Accessory Uses and Structures) for general reference - it is not legal advice. Regulations change; always confirm current requirements with Minneapolis Community Planning & Economic Development (CPED) before designing or applying for permits. See sources below.
Zoning & size requirements

What you're allowed to build

ADU typeMax sizeMax heightNotes
Detached (new build or garage conversion) 1,000 sq ft or 50% of the primary dwelling's finished floor area, whichever is smaller 20 ft Typically must sit behind the primary dwelling
Attached / internal (basement, above-garage addition) Sized within the primary structure - no separate detached-style cap Same as primary structure Common approach for basement or above-garage conversions

Allowed zoning districts: lots zoned for one- and two-family residential use, citywide. Confirm your parcel's zoning district with CPED.

Additional standards

Setbacks, parking & other rules

Setbacks3 ft from side and rear property lines; 5 ft from an alley for above-garage units
ParkingNo additional off-street parking required for the ADU itself
Units per lot1 ADU permitted in addition to the primary dwelling
Owner-occupancyNot required citywide as of a recent zoning amendment (previously required). Some internal ADUs may still require a recorded covenant - confirm with CPED.
Building codeMust meet 2020 Minnesota Residential Code dwelling unit standards
Rental licenseA separate city rental license is required if the ADU or the primary home is rented out
Permit process

How Minneapolis ADU permitting works

1

Pre-application check

Confirm zoning eligibility for your specific lot with CPED before designing.

2

Submit zoning application

File your site plan with the ADU zoning review; the administrative fee is typically around $325.

3

Plan review

The city reviews for zoning and building code compliance. Incomplete applications get a deficiency notice within 15 business days.

4

Building permit & construction

Once zoning is approved, pull your building permit and begin construction.

Applications left incomplete for 30+ days are typically withdrawn, and decisions can be appealed within 10 calendar days. Fees and timelines are approximate - confirm current figures with CPED.

FAQ

Common questions

Do I need to live on the property to build an ADU in Minneapolis?
No. Minneapolis removed its citywide owner-occupancy requirement, so you can build and rent out an ADU without living on site. Some internal ADU conversions may still require a recorded covenant - confirm with CPED.
How many ADUs can I build on one lot?
Minneapolis allows one ADU per lot in addition to the primary dwelling.
Do I need extra parking for an ADU?
No additional off-street parking is required specifically for the ADU.
How long does the permit process take?
Zoning review and building permit approval commonly take several weeks to a couple of months depending on application completeness and project type - confirm current timelines with CPED.
What's the maximum size for a detached ADU?
Up to 1,000 sq ft or 50% of your home's finished floor area, whichever is smaller, with a 20 ft height limit.